Download: RSS | Email Alerts | SMS Alerts | Podcasts | Mobile
Find It!

become a fan!
Local 15 Poll
Traffic: Mobile/Pensacola, FL
Last Update: 11/20/2009 3:50:03 PM

Severity: Construction

Problems: Paving operations
Location: E OLIVE RD Both EB/WB between N 9TH AV and SCENIC HWY
Lanes Impacted:
DRIVERS CAN EXPECT INTERMITTEN LANE RESTRICTIONS DURING THE DAYTIME HOURS. LANE CLOSURES WILL OCCUR BETWEEN 6 PM AND 6 AM WHEN DRIVERS WILL BE LEAST AFFECTED.
Reported on 11/19/2009 6:00:00 PM and Expected to end on 11/20/2009 6:00:00 PM

Problems: Paving operations
Location: US 29 Both NB/SB between HIGHWAY 97 and CO HWY 164
Lanes Impacted:
RESURFACING TO BEGIN LATE NOVEMBER 2009. THE 4.5 MILE PROJECT EXTENDS FROM ATMORE HWY TO NORTH OF PINE BARREN ROAD AND WILL CONSIST OF RESURFACING TURN LANE INSTALLATION AND DRAINAGE WORK. TRAFFIC WILL BE RESTRICTED TO ONE LANE AND MOTORISTS ARE BEING REMINDED TO USE EXTREME CAUTION,ND WATCH FOR WORKERS AND EQUIPMENT IN THE ROADWAY AND OBEY ALL POSTED SIGNS.
Reported on 11/16/2009 12:00:00 AM and Expected to end on 7/1/2010 12:00:00 AM

Problems: Long-term road construction
Location: Perdido Key Dr None at River Rd
Lanes Impacted:
DRIVERS CAN EXPECT DAILY LANE CLOSURES BETWEEN 7 AM AND 6 PM. DOT IS ADVISING DRIVERS TO USE CAUTION AND OBEY THE POSTED SPEED LIMIT.
Reported on 9/15/2009 7:00:00 AM and Expected to end on 11/30/2009 5:30:00 PM

Problems: Bridge maintenance operations
Location: I 110 None at I 110
Lanes Impacted:
CLEANING AND PAINTING WORK ON THE I-110 BRIDGE NEAR THE CIVIC CENTER. EXPECT INTERMITTEN LANE RESTRICTIONS, HOWEVER THERE WILL BE NO LANE CLOSURES BETWEEN 10:30 AM AND 7:30 PM. USE CAUTION AND WATCH FOR WORKERS ENTERING EXITING THE WORK ZONE.
Reported on 11/19/2009 6:00:00 PM and Expected to end on 11/20/2009 6:00:00 PM

Problems: Construction work
Location: I 10 Both EB/WB between GEORGE C WALLACE TUNL and US 90/US 98/EXIT 35
Lanes Impacted:
SEVERAL DIFFERENT PROJECTS UNDERWAY ALONG THE BAYWAY. LANE CLOSURES ARE SCHEDULED FOR THE OVERNITE HOURS BUT DRIVERS MAY EXPERIENCE MINOR DELAYS FROM ONGOING DAYTIME CONSTRUCTION. WATCH FOR WORKERS AND EQUIPMENT ENTERING AND EXITING THE AREA.
Reported on 11/19/2009 6:00:00 PM and Expected to end on 11/20/2009 6:00:00 PM

Problems: Long-term road construction
Location: US 43 Both NB/SB between CO HWY 96/COY SMITH HWY/MILITARY RD and MOBILE/WASHINGTON COUNTY LINE
Lanes Impacted:
ROAD AND BRIDGE WORK IN THE CALVERT AREA COULD CAUSE OCCASIONAL DELAYS IN THE AREA. PROJECT EXPECTED TO BE DONE BY NOVEMBER 2009.
Reported on 11/19/2009 6:00:00 PM and Expected to end on 11/20/2009 6:00:00 PM

Problems: Long-term road construction
Location: US 98 Both EB/WB between HWY 292/PACE BLVD/GARDEN ST and HWY 295/S NEW WARRINGTON RD
Lanes Impacted:
LONG TERM CONSTRUCTION: REPLACEMENT OF THE BAYOU CHICO BRIDGE. DOT WILL ALSO BE WORKING ON THE APPROACHES TO THE BRIDGE. THE WB BRIDGE WILL BE CONVERTED TO ACCEPT TWO WAY TRAFFIC. USE CAUTION THRU THE AREA AND WATCH FOR WORKERS ENTERING AND EXITING THE AREA. DOT SAYS PROJECT EXPECTED TO BE COMPLETED BY JANUARY 4, 2010.
Reported on 11/19/2009 6:00:00 PM and Expected to end on 11/20/2009 6:00:00 PM




  This site is hosted and managed by Inergize Digital.
WPMI files and maintains quarterly Children's Television Reports in its Public File.
The Public File is available for viewing by the public at 661 Azalea Road, Mobile AL 36609, weekdays from 8:00am to 5:30pm.